{"id":108015,"date":"2021-10-25T12:00:20","date_gmt":"2021-10-25T17:00:20","guid":{"rendered":"http:\/\/news.olemiss.edu\/?p=108015"},"modified":"2021-10-28T11:53:01","modified_gmt":"2021-10-28T16:53:01","slug":"groundbreaking-set-for-friday-on-duff-center","status":"publish","type":"post","link":"https:\/\/web20.olemiss.edu\/news\/wordpress\/groundbreaking-set-for-friday-on-duff-center\/","title":{"rendered":"Groundbreaking Set for Friday on Duff Center"},"content":{"rendered":"<div id=\"attachment_108021\" style=\"width: 600px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/groundbreaking-set-for-friday-on-duff-center\/ucimg-1987-1\/\" rel=\"attachment wp-att-108021\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-108021\" class=\"wp-image-108021\" src=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1-640x359.jpg\" alt=\"\" width=\"590\" height=\"331\" srcset=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1-640x359.jpg 640w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1-300x168.jpg 300w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1-768x431.jpg 768w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1-1536x863.jpg 1536w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1-580x326.jpg 580w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1.jpg 2048w\" sizes=\"(max-width: 590px) 100vw, 590px\" \/><\/a><p id=\"caption-attachment-108021\" class=\"wp-caption-text\">The university hosts the ceremonial groundbreaking for the Jim and Thomas Duff Center for Science and Technology Innovation at 10 a.m. Friday (Oct. 29). The 202,000-square-foot facility is the largest single building project ever on the Oxford campus.<\/p><\/div>\n<p>OXFORD, Miss. \u2013 <a href=\"https:\/\/olemiss.edu\/\" target=\"_blank\" rel=\"noopener noreferrer\">University of Mississippi<\/a> leaders, U.S. Sen. Roger Wicker, donors Jim and Thomas Duff, and others will ceremonially break ground Friday (Oct. 29) on the largest single construction project in the history of the Oxford campus, leading the way for more students to pursue science, technology, engineering and mathematics careers.<\/p>\n<p>The Jim and Thomas Duff Center for Science and Technology Innovation is projected to be among the nation\u2019s top student-centered learning environments for STEM education. With a focus on increasing job opportunities and boosting the economy, the Hattiesburg leaders and brothers have committed $26 million to the construction of the 202,000-square-foot building. Its $175 million total project cost includes roughly $135 million in construction expenses.<\/p>\n<p>William Yates of Yates Construction Co., which will build the facility, also will speak at the public event, set for 10 a.m. The Duff Center will be in the Science District, with one side facing the Grove and another facing Vaught-Hemingway Stadium and The Sandy and John Black Pavilion at Ole Miss.<\/p>\n<div id=\"attachment_108022\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/groundbreaking-set-for-friday-on-duff-center\/ucimg-1987-2\/\" rel=\"attachment wp-att-108022\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-108022\" class=\"size-medium wp-image-108022\" src=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-2-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-2-300x183.jpg 300w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-2-768x469.jpg 768w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-2-1536x937.jpg 1536w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-2-640x390.jpg 640w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-2.jpg 2021w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-108022\" class=\"wp-caption-text\">The Jim and Thomas Duff Center for Science and Technology Innovation will house a student success and supplemental instruction center and a food service area within a central social hub. The facility also will feature technology-enabled active learning, or TEAL, traditional labs and a 3D visualization lab.<\/p><\/div>\n<p>UM Chancellor Glenn Boyce said the project signals the university\u2019s commitment to producing graduates well-prepared for fields flush with career opportunities and applauded the Duff family and the Gertrude C. Ford Foundation for their major support.<\/p>\n<p>\u201cThere is a critical need to increase the number of graduates in STEM fields to support growth and innovation in our state, region and nation,\u201d he said. \u201cJim and Tommy Duff\u2019s tremendous support will help strengthen the pipeline for training engineers, tech entrepreneurs, and science and math teachers.<\/p>\n<p>\u201cThe Duffs, the Ford Foundation, the state of Mississippi and many other alumni and friends have joined our efforts to enrich educational opportunities in Mississippi, and their investments will have a significant return. In the coming years, STEM job creation will outpace non-STEM jobs, and STEM professionals will earn higher salaries, yielding more attractive opportunities for our students in Mississippi and beyond.\u201d<\/p>\n<p><iframe loading=\"lazy\" title=\"Duff Center Groundbreaking\" width=\"600\" height=\"338\" src=\"https:\/\/www.youtube.com\/embed\/5SP4aqhrJGE?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<p>In a joint statement, Jim and Thomas Duff expressed their hopes for the new facility.<\/p>\n<p>\u201cOur family firmly believes that the future of Mississippi is favorably influenced by education and we are proud to support this particular project at the University of Mississippi. We are confident that this state-of-the-art STEM facility will have a long-term impact on the lives of students at Ole Miss who are learning the value of hard work and unique skills to benefit them for a lifetime. Additionally, the state of Mississippi will enjoy the benefits of this important facility for many years to come.<\/p>\n<p>\u201cJob creation, economic development, improved quality of life and so much more will be priceless benefits of this endeavor and it\u2019s a legacy in which we are honored to be included.\u201d<\/p>\n<p>The additional space and technological advances offered by the Duff Center are crucial to serving the Ole Miss student enrollment, which is increasing.<\/p>\n<div id=\"attachment_108025\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/groundbreaking-set-for-friday-on-duff-center\/ucimg-1987-5\/\" rel=\"attachment wp-att-108025\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-108025\" class=\"size-medium wp-image-108025\" src=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-5-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-5-300x183.jpg 300w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-5-768x469.jpg 768w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-5-1536x938.jpg 1536w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-5-640x391.jpg 640w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-5.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-108025\" class=\"wp-caption-text\">The Duff Center will be a crown jewel within the university\u2019s Science District and will be situated along All-American Drive. The new learning environment fostered by the center will provide all students, regardless of major, a greater understanding of the role of science in society.<\/p><\/div>\n<p>The university can expand STEM courses, especially those that require laboratory work and group projects, with the added classroom and laboratory space and nontraditional teaching spaces that facilitate active learning. In the limited space where active learning is currently possible, the participating students\u2019 reviews are overwhelmingly positive.<\/p>\n<p>\u201cWe are thrilled to benefit from Jim and Tommy\u2019s generosity and vision,\u201d said Charlotte Parks, vice chancellor for development. \u201cThey recognize what an impact the Duff Center will have on the entire region, and we are grateful for the inspiration it will be for students of all ages. Most every student at Ole Miss will have a class in this leading-edge facility, and thousands of visitors here for sporting events will see it and know our commitment to STEM education.<\/p>\n<p>\u201cIn addition, the center will support the university in its progress toward encouraging STEM fields of study among first-generation college students and underrepresented groups. As an open access institution, we welcome students from all academic achievement levels and empower them with tools for career success.\u201d<\/p>\n<div id=\"attachment_108024\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/groundbreaking-set-for-friday-on-duff-center\/ucimg-1987-4\/\" rel=\"attachment wp-att-108024\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-108024\" class=\"size-medium wp-image-108024\" src=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-4-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-4-300x183.jpg 300w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-4-768x469.jpg 768w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-4-1536x938.jpg 1536w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-4-640x391.jpg 640w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-4.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-108024\" class=\"wp-caption-text\">The Duff Center project includes an outdoor area honoring author William Faulkner, who wrote his acclaimed novel &#8216;As I Lay Dying&#8217; in the university&#8217;s old power plant, which stood on the site.<\/p><\/div>\n<p>The Duff Center will house lecture halls as well as chemistry, biology, physics, engineering and computer science labs. Lower student-instructor ratios will be in place, and various disciplines will be spread throughout the building to promote interdisciplinary teaching and learning.<\/p>\n<p>Among other building highlights, students will enjoy technology-enabled active learning, or TEAL, traditional labs and a 3D visualization lab, similar to a small IMAX theater. Engineering students will have access to dedicated lab spaces, including fabrication and testing equipment, for their senior design projects.<\/p>\n<p>Several common areas will give students space to study individually and in small groups, and a STEM tutoring center will provide additional support.<\/p>\n<p>Such innovations appealed to the Duff brothers, who are widely known for their entrepreneurial spirit and for responding to opportunities with solutions, Thomas Duff said.<\/p>\n<p>What began as a small-town enterprise quickly grew under the leadership of the Duff brothers, who saw unique opportunities for the development of solution-providing companies. That forward-thinking force became <a href=\"https:\/\/dcinvestors.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Duff Capital Investors<\/a>, a privately-owned company headquartered in the town of Columbia.<\/p>\n<div id=\"attachment_108023\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/groundbreaking-set-for-friday-on-duff-center\/ucimg-1987-3\/\" rel=\"attachment wp-att-108023\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-108023\" class=\"size-medium wp-image-108023\" src=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-3-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-3-300x183.jpg 300w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-3-768x469.jpg 768w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-3-1536x938.jpg 1536w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-3-640x391.jpg 640w, https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-3.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-108023\" class=\"wp-caption-text\">Work has begun on the Duff Center in the university&#8217;s Science District, with one side facing the Grove and another facing Vaught-Hemingway Stadium and The Sandy and John Black Pavilion at Ole Miss. Photo by Robert Jordan\/Ole Miss Digital Imaging Services<\/p><\/div>\n<p>DCI comprises 20 companies, providing more than 13,000 employment opportunities across the nation and generating nearly $4 billion in total revenues. The company includes Southern Tire Mart, KLLM Transport Services, Frozen Food Express, TL Wallace Construction, DeepWell Energy Services, Pine Belt Motors and many other companies founded as solution providers.<\/p>\n<p>The <a href=\"https:\/\/www.gertrudecford.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Gertrude C. Ford Foundation<\/a>, of Jackson, committed $20 million to the facility and later pledged another $5 million for the gardens that will surround the building, including a commemorative area honoring renowned author William Faulkner.<\/p>\n<p>For more information on supporting the STEM facility, contact Charlotte Parks at <a href=\"mailto:cpparks@olemiss.edu\" target=\"_blank\" rel=\"noopener noreferrer\">cpparks@olemiss.edu<\/a> or 662-915-3120; or visit <a href=\"http:\/\/give.olemiss.edu\" target=\"_blank\" rel=\"noopener noreferrer\">http:\/\/give.olemiss.edu<\/a>. Other naming opportunities are available inside the Duff Center.<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>OXFORD, Miss. \u2013 University of Mississippi leaders, U.S. Sen. Roger Wicker, donors Jim and Thomas Duff, and others will ceremonially break ground Friday (Oct. 29) on the largest single construction project in the history of the Oxford campus, leading the way for more students to pursue science, technology, engineering and mathematics careers. The Jim and<a class=\"more-link\" href=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/groundbreaking-set-for-friday-on-duff-center\/\" rel=\"nofollow\">Read the story &#x2026;<\/a><!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":21,"featured_media":108021,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[221,199,460],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v15.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Groundbreaking Set for Friday on Duff Center - Ole Miss News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/news.olemiss.edu\/groundbreaking-set-for-friday-on-duff-center\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Groundbreaking Set for Friday on Duff Center - Ole Miss News\" \/>\n<meta property=\"og:description\" content=\"OXFORD, Miss. \u2013 University of Mississippi leaders, U.S. Sen. Roger Wicker, donors Jim and Thomas Duff, and others will ceremonially break ground Friday (Oct. 29) on the largest single construction project in the history of the Oxford campus, leading the way for more students to pursue science, technology, engineering and mathematics careers. The Jim andRead the story &#x2026;\" \/>\n<meta property=\"og:url\" content=\"http:\/\/news.olemiss.edu\/groundbreaking-set-for-friday-on-duff-center\/\" \/>\n<meta property=\"og:site_name\" content=\"Ole Miss News\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-25T17:00:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-28T16:53:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1-768x431.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"431\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@OleMissRebels\" \/>\n<meta name=\"twitter:site\" content=\"@OleMissRebels\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/#website\",\"url\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/\",\"name\":\"Ole Miss News\",\"description\":\"The official source for University of Mississippi news\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"http:\/\/news.olemiss.edu\/groundbreaking-set-for-friday-on-duff-center\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-content\/uploads\/2021\/10\/UCIMG-1987-1.jpg\",\"width\":2048,\"height\":1150,\"caption\":\"The University of Mississippi hosts the ceremonial groundbreaking for the Jim and Thomas Duff Center for Science and Technology Innovation at 10 a.m. Friday (Oct. 29). The 204,000-square-foot facility is the largest single building project ever on the Oxford campus.\"},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/news.olemiss.edu\/groundbreaking-set-for-friday-on-duff-center\/#webpage\",\"url\":\"http:\/\/news.olemiss.edu\/groundbreaking-set-for-friday-on-duff-center\/\",\"name\":\"Groundbreaking Set for Friday on Duff Center - Ole Miss News\",\"isPartOf\":{\"@id\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\/\/news.olemiss.edu\/groundbreaking-set-for-friday-on-duff-center\/#primaryimage\"},\"datePublished\":\"2021-10-25T17:00:20+00:00\",\"dateModified\":\"2021-10-28T16:53:01+00:00\",\"author\":{\"@id\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/#\/schema\/person\/d4bf035e3525c2ab25705f9027efa4b7\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/news.olemiss.edu\/groundbreaking-set-for-friday-on-duff-center\/\"]}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/#\/schema\/person\/d4bf035e3525c2ab25705f9027efa4b7\",\"name\":\"mdiggs\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/web20.olemiss.edu\/news\/wordpress\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"http:\/\/1.gravatar.com\/avatar\/d371a0d52cfd35bcb9097cd51563d680?s=96&d=mm&r=g\",\"caption\":\"mdiggs\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/posts\/108015"}],"collection":[{"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/comments?post=108015"}],"version-history":[{"count":8,"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/posts\/108015\/revisions"}],"predecessor-version":[{"id":108123,"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/posts\/108015\/revisions\/108123"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/media\/108021"}],"wp:attachment":[{"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/media?parent=108015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/categories?post=108015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/web20.olemiss.edu\/news\/wordpress\/wp-json\/wp\/v2\/tags?post=108015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}